Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Table of Contents

Introduction

MultiA multi-project LQA report is a kind of report which holds linguists' that contains the linguist LQA data for many projects. Naturally, projects where in which LQA was has not been performed are not included in the report.

Please, keep Keep in mind that the a multi-project LQA report is based directly on the evaluative LQA report for a given particular linguist (i.e. it presents data from all the included projects where in which the evaluative LQA process was has been performed and the corresponding report has been generated).

Prior to Before reading the content of this article, please, make sure you are familiar with we recommend that you read the Linguist (evaluative) LQA report section in the following article: Types of LQA report - description and use case.

...

How to generate the report

...

  1. As a user with an Administrator and/or Project manager role, go to: Projects → Project list → Actions → (expand the list) → Reports → Multi-project LQA.

...

2. Choose the projects which should that are to be included in the report and click on select the Run button Run.

Info

It is possible to generate a report when any project is checked - then. Then, the report will involve include every available project with performed LQA on itfor which LQA has been performed.

3. After clicking you click the Run button Run there should be a pop-up opened with following options, a popup containing the following options should open:

...

As you can see, there are a couple of options criteria to narrow down for restricting the report results.

Note

IMPORTANT!

Between There is an AND condition between multi-select fields there is the AND condition, so all chosen values chosen must match a corresponding field for it to be shown included in the report.

4. Choose the aforementioned parameters mentioned above and then click on the Run button Run.

The pop-up popup is hidden, and the report is generating generated in the background. When finished, an Excel file is automatically downloaded onto the device.

...

Apart from the project name, the generated report has contains one sheet and contains the same columns like as in the scorecard in Project editor → LQA:

  • Source language;,

  • Target language;,

  • Workflow step;,

  • Filename;,

  • Score;,

  • Words;,

  • Evaluee;,

  • Evaluator.

...

Subcontracting

Subcontractors can also generate multi-project LQA reports for subcontracted projects from the same place. Values are taken from the tab Projects → LSP LQA, tab and the respective relevant LQA scorecard.