Once both sides have specified all the information correctly, and clicked the Save button, a green message should be displayed, confirming that a two-way connection has been established.
...
If the connection details are missing or incorrect, and a user clicks the Save button, a yellow message should be displayed, informing them:
...
Why is it not possible to start the project on the LSP side when the LSP has been assigned to the first step in the project’s workflow?
If a yellow border is displayed in the project’s workflow on the LSP (contractor) side, when the LSP has been assigned to the first workflow step, this indicates that the project has simply not been started on the contractor’s side.
...
If an attempt to assign the LSP to a particular workflow step, from an unavailable server, fails, you can select Project Editor → Workflow to display a message containing details, and the workflow for this project will be blocked.
...
If it is not possible to assign the LSP to a step, an email informing about the failure to do so is sent to the PM (Project Manager) who performed the action, or to the project’s PM/ PW (Project Watcher) if the action was done automatically.
...